Barber Lake facility assets and Cipher Barber Lake LLC equity
Covenants
Incurrence-based (no maintenance ratios). Additional debt capped at 50% of trailing 4Q NOI post-construction. DSRA required ($110M minimum post-construction). 50% excess cash flow sweep at par. SPE covenants restricting operations to Barber Lake Facility.
Prepayment
Prior to Nov 15, 2027: make-whole (T+50bps) or up to 40% at 107.125% from equity proceeds. On/after Nov 15, 2027: 103.563%. 2028: 101.781%. 2029+: par. Change of control: 101%.